Features

Feature

Source (Requirments)

Solution

implementation

difficulty

time required

effectiveness

Priority

Feature

Source (Requirments)

Solution

implementation

difficulty

time required

effectiveness

Priority

Grabber

 

Pincer

 

 

 

 

 

Grabber

 

vacuum cleaner

 

5

 

 

 

Grabber

 

grab tube

 

 

 

 

 

Grabber

 

rotary grabber

 

 

 

 

 

Drivetrain

 

Mecanum Wheels

Revised Go Builda Strafer

2

1

2

3.3

Drivetrain

 

Mecanum Tracks

 

3

4

3

2.8

Drivetrain

 

Normal Wheels

 

2

1

1

2.8

Drivetrain

 

Normal Tracks

 

2

3

2

2.9

Drivetrain

 

Omni Wheels

 

2

1

1

2.8

Drivetrain

 

Flight

 

5

5

0

0

Drivetrain

 

Mecanum Wheels with Suspension

 

3

3

3

3.1

Drivetrain

 

Mecanum Tracks with Suspension

 

4

5

4

2.5

Drivetrain

 

Normal Wheels with Suspension

 

3

3

2

2.6

Drivetrain

 

Normal Tracks with Suspension

 

3

4

3

2.8

Drivetrain

 

Omni Wheels with Suspension

 

3

3

2

2.6

Very High = 5

High = 4

Medium = 3

Low = 2

Very Low = 1

Non-existent = 0

time required = anticipated time required

difficulty = risk of delay or failure

effectiveness = expected gain

priority = (effectiveness-(time*dfficulty)/5+5)/2

The formula for priority was devised to constrain domain and range to ([zero, five]).

I used this to graph the function https://www.desmos.com/calculator